In industrial production and daily life, diesel generator sets play a vital role as backup power sources. To ensure their proper operation and efficient performance, correct installation procedures are crucial. Below, we will detail the specific steps for installing and commissioning diesel generator sets.
I. Pre-Installation Preparations
1. Site Selection: Choose a well-ventilated, dry, level location away from flammable or explosive materials. Ensure sufficient space accommodates the generator set and auxiliary equipment while facilitating operation and maintenance.
2. Foundation Construction: Build a sturdy concrete foundation based on the unit's dimensions and weight. The foundation must possess adequate load-bearing capacity to prevent vibration and displacement during operation.
3. Transportation Preparation: Arrange suitable transport to safely deliver the diesel generator set to the installation site. Protect the unit from damage during transit.
II. Hoisting and Positioning the Unit
4. Use professional lifting equipment, such as cranes or forklifts, to carefully hoist the diesel generator set onto the foundation.
5. Maintain the unit's balance and stability during hoisting to prevent collisions or tilting. 3. Position the unit precisely on the foundation, adjusting its level and centerline alignment to ensure perfect fitment.
III. Connecting Piping and Wiring
1. Connect fuel lines: Link the fuel tank to the unit's fuel inlet, ensuring all connections are sealed and leak-free.
2. Connect cooling water lines: Connect the unit's cooling water tank to the external cooling water source, guaranteeing unobstructed circulation.
3. Connect exhaust pipes: Attach the unit's exhaust pipe to the muffler and direct exhaust gases to the designated discharge point.
4. Connect electrical circuits: Follow the unit's electrical schematic to connect power cables, control wires, and signal lines, ensuring all connections are correct and secure.
IV. Install Auxiliary Equipment
1. Install fuel tank: Secure the fuel tank in the appropriate position and ensure it contains sufficient fuel.
2. Install the battery: Connect the battery terminals and verify that the battery charge and voltage are normal.
3. Install the muffler: Mount the muffler on the exhaust pipe to reduce operational noise.
4. Install protective devices: Install safety devices such as overload protection, short-circuit protection, and leakage protection to ensure safe operation.
V. Commissioning and Trial Operation 1. Verify all unit parameters: Check engine oil pressure, coolant temperature, voltage, frequency, etc., ensuring they fall within normal ranges.
2. Conduct no-load trial operation: Start the unit and run it under no-load conditions for a period to inspect operation, listening for abnormal sounds or vibrations.
3. Load trial operation: Gradually increase the load to evaluate the unit's performance and stability under varying load conditions.
4. Calibrate protection devices: Ensure protection mechanisms activate promptly under abnormal conditions to safeguard the unit from damage. VI. Acceptance and Commissioning
1. Organize relevant personnel for acceptance inspection to verify installation quality, operational performance, and compliance with all technical specifications.
2. Train operators to familiarize them with unit operation methods and precautions.
3. Compile installation and commissioning documentation for handover to the user.
In summary, the installation and commissioning of diesel generator sets is a complex and rigorous process requiring professional technicians to follow standardized procedures. Only through such meticulous execution can the safe and reliable operation of the unit be ensured, providing users with stable power supply assurance.

Company Address: Room 101, No. 58 Huanchang West Road, Changping Town, Dongguan City, Guangdong Province

National Service Hotline:+86 0769-82200593 [Backend]

Guangdong San'ao New Energy Technology Co., Ltd. Record Number: Guangdong ICP No. 19032219